|
DAVAO PORT INFORMATION
1. Government pier
1-1. SASA Wharf
Old quay : LOA 515m / Draft 9.5m --- for gen.cargo vessel
under rehabilitation, estd to completd on Aug 2002
New quay : LOA 405m / Draft 9.5m --- for container vessel
disch rate : wheat 500-600mt/day/gang
urea 250-300mt/day/gang direct to truck
asphalt in drum 600-700mt/day/gang
billet 800-900mt/day/gang direct to pier & hauling
1-2. Sta.Ana pier : mainly for domestic vessel
1-3. Mati Wharf : for corn, copra, logs, gen.cargoes
LOA : 81m / Draft 6.5m
Foreign vessel call (1999) : nil
2. Private pier
2-1. Caltex pier (non-commercial)
LOA 100m / Draft 7m w/ 4 breasting dolphins
Foreign vessel call (1999): 8
Import : 5,767mt
Export : nil
2-2. Pacific Int'l Terminal pier (non-commercial)
LOA 110m / Draft 12m
handling cargoes : Bananas
Foreign vessel call (1999): 122
Import bulk/breakbulk : 5,228mt
Export bulk/breakbulk : 294,161mt
2-3. Legaspi Oil Company pier (non-commercial)
finger pier LOA 58m & 71m / Draft 11m
marginal pier LOA 198m / Draft 11m
handling cargoes : copra, coco oil & copra pellets
Foreign vessel call (1999): 30
Import bulk/breakbulk : 14,596mt
Export bulk/breakbulk : 85,811mt
2-4. Petron pier (non-commercial)
LOA 99m / Draft 7m w/ 2 mooring & 2 breasting dolphins
Foreign vessel call (1999): nil
2-5. Universal Bobina pier (non-commercial)
LOA 36.5m / Draft 10m w/conveyor facility
handling cargoes : Flour Grains
2-6. Davao Union Cement pier (non-commercial)
berth 1 : LOA 142m / Draft 7m
berth 2 : LOA 161m / Draft 9.5m
berth 3 : LOA 168m / Draft 10.5m
handling cargoes : cement, coal by clampshell to hopper/conveyor
disch rate : coal/BF Slag/Steel Slag 700-750mt/day/gang
cement clinker 500-600mt/day/gang by clambshell
MV QUOC TU GIAM (4/28/02) : dischd 6,329mt Coal in bulk for 2.94
days
2-7. Tefasco pier : LOA 400m / Draft 9.0m
Asphalt in drums disch 2,500-2,800mt/day/4 gangs
Urea in bulk disch 1,000-1,200mt/day/4 gangs by clambshell to
hopper-truck
MOP disch 1,000mt/day/4 gangs by net sling to hopper
MV IMABARI GLORY (3/25/02) : dischd 3,551mt Billet for 0.97 days
3. Stevedorage (PPA MC No. 04-2001)
3-1. Gen.Cargo - breakbulk/bulk : non-pallet P81.40/RT, palletized
P57.65/RT
3-2. Vehicles : P67.75/RT
3-3. Heavy Lift : 5-15T P227.95/MT
15-20T P330.85/MT
over 20T P382.75/MT
3-4. Lumber : non-pallet P81.40/CBM, palletized P57.65/CBM
3-5. Bulk Cargo : P66.15/MT
** UNION CEMENT DAVAO PLANT (PHINMA GROUP)
++ Contacts : Evelio G. Echavez / SVP for Operations
Phone : (082) 2380598 Fax : (082) 2380309
E-mail : egelink@gatesway.com
Capacity
Clinker - 1.7 million metric tons per year
Cement - 1.8 million MTPY
Packing - 7,500 bags (40 kgs each) per hour
Bulk ship loading - 1,200 metric tons per hour
The Union Cement - Davao Plant has three kilns; a single-string precalciner line
rated at 3,500 MTPD of clinker; another, similar unit rated at 1,750 MTPD; and a
wet process line rated at 500 MTPD.
The plant has its own, world-class seaport that can handle 40,000 metric tons
per shipment. The port has a total length of 500 meters and draft of 12 meters.
On the port are the packing facilities, which include three rotary packers (each
with a capacity of 3,000 forty-kilogram bags per hour) aided by automatic bag
placers and automotive truck loaders; and facilities for bulk-loading 1.0
metric-ton bags; facilities for loading ocean-going vessels. For bulk-cement
ships, the port uses a mechanical loading system.
|